•  
  •  
 

Agency

Center for Archaeological Research

DOI

https://doi.org/10.21112/ita.1986.1.13

Abstract

During August 1983, archaeological survey and testing were conducted at Flume No.3 for the Coleto Creek power plant reservoir in Goliad County, Texas. The work included survey of the entire Flume No.3 route, testing one site (41 GD 30B) located at the flume outlet on Coleto Creek, survey and testing of an alternate fl ume route downstream, and testi ng at another site designated 41 GD 31. The right-of-way survey revealed a historic site (41 GD 48) in the proposed spoil area; no further work is recommended at this site. Testing at 41 GD 30B provided necessary additional information on the site's area and depth. It was judged that the flume outflow could damage the integrity of the site, and that the site should be avoided or the impact mitigated. Survey and testing of the alternate, downstream flume route indicated this route provides the best alternative for reservoir outflow since no cultural resources were found on the surface and a possible buried component at 41 GD 31 would probably be too deeply buried to be affected.

Creative Commons License

Creative Commons Attribution-NonCommercial 4.0 International License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License

Share

 
COinS

Tell us how this article helped you.

 
 

To view the content in your browser, please download Adobe Reader or, alternately,
you may Download the file to your hard drive.

NOTE: The latest versions of Adobe Reader do not support viewing PDF files within Firefox on Mac OS and if you are using a modern (Intel) Mac, there is no official plugin for viewing PDF files within the browser window.